The Air Quality Division (AQD) Permit Section has updated and revised the permit to install application form. Permit to Install Application and Instructions . One of the most important aspects of a successful marine construction project is proper permitting and compliance. I have to give Justin Pung at the DEQ two big thumbs up for making the process easy and problem free. The EGLE/USACE Joint Permit Application (JPA) covers permit requirements derived from state and federal rules and regulations for construction activities where the land meets the water. The Joint Permit Application is a multi-purpose application used to describe and quantify proposed For example, any construction activity that involves earthen work requires a local or county-issued soil erosion and sedimentation control permit. New Seawall Construction – the construction of a new seawall requires an individual permit. ... Over 300’ of rock protection is an individual permit. I can't wait until summer to get the beach in tip top shape so the kids can swim and play, I am going to try the pellets as suggested above. A common example is a seawall that’s permitted through the DEQ … Michigan Air Permits System . Is an SESC permit required if I obtained a permit from the DEQ for a land/water interface activity. Yes, if the project involves earth work within 500 feet of a lake or stream or disturbs one or more acres of land. We applied for a permit to alter the beachfront and had no problems with the DEQ. The Michigan Department of Environmental Quality is tasked with protecting our state’s environment and ensuring that all water construction projects aren’t damaging the ecosystem..  The Water Resources Division (WRD), within the Michigan Department of Environment Great Lakes and Engery (EGLE), is responsible for protecting the natural resources and the public trust waters of Michigan's inland lakes and streams under the authority of Part 301, Inland Lakes and Streams, of the Natural Resources and Environmental Protection Act, 1994 PA 451, as amended (NREPA This Joint Permit Application was developed to facilitate the state and federal permit application process administered by the Michigan Department of Environmental Quality (DEQ) and the U.S. Army Corps of Engineers (USACE). DEQ Permit Requirements Before, During, and after Draw Down Sanding – Reasonable sanding above the water line is exempt. The changes include: The new form is dated "Rev. 09/2015" on the bottom right corner. Nearly all shoreline modifications, such as seawalls, rock rip-rap or bio-engineered erosion controls require permits from the Michigan Department of Environmental Quality.

michigan deq seawall permit