01. Discussion in 'Cranes' started by terex herder, May 3, 2020. Solution: W = 5000t, GM = 0.3m, Weight shifted (w) = 20t & d= 5m Listing LOAD TESTING USING KENTLEDGE AND REACTION PILE METHOD Foo Hee Kang, Managing Director Resource Piling Pte. I think a …
It is suitable for medium open cast mine with an annual output of about 10 million tons. Yes, it flipped backwards against the A frame, which held.
thanks for that great followup video, jz79!
Features . Failure to follow these terms may result in the seller turning away the attempt of your driver to pick up the purchased item(s). Hours of operation are subject to change for Holiday Schedules You must call at least 24 hours in advance to schedule pickup No Loading Dock, Ramps, or Forklift Available: Only RGN or trailers with ramps can be used to pick up this item at this location.
No reason of analysis yet. Funny there seems to be no video of the lift before the failure. Joined: Jun 26, 2011 Messages: 3,544 Occupation: s/e Heavy equipment operator Location: Western Washington. Page 1 of 3 1 2 3 Next > terex herder Senior Member. It can be matched with 172-326t mining dumping truck and 3000t/h-5000t/h self-movable crush station. WK-35 rope shovel is mainly used for the excavation of blasted rock and ore in large open pit coal mine, iron mine and non-ferrous metal mine. 28 July 2001 Guidance MGN 193 (M+F) The effects of alcohol or drugs on survival at sea . Yes, it seems that hook failed. MARINE OPERATIONS: 500M SAFETY ZONE Working together to continuously improve our safety performance. Ronsii Senior Member. But the crane itself was not … I wonder if that has been put under wraps by the legal be-gals.
72hayes likes this. and as we know know from further reports, it seems it was the hook that failed..wow. On a ship of W 5000t , GM 0.3m, 20t was shifted transversely by 5m. Ltd, Singapore A Keller Group Company . Find the list. Post #3541197 ; Post #3542820 ; Post #3541582 ... the yellow load block IS on the lift side. terex herder, May 3, 2020 #1. Active marine guidance notes (MGNs) ... MGN 190 (F) Copper pipe failure in engine cooling water systems. Joined: Nov 11, 2017 Messages: 267 Location: Kansas . This ones going to leave a mark. OT: offshore crane collapse; Likes: 97. 02 Abbreviations / Terminology 02 Reference Documents 03 Introduction & Background 04 Statistics from HSE 05 Good Practice 05 Legislation & Responsibilities 06 Safety Zone Legislation 06 Responsibilities 06 Duty Holder 07 Installation OIM 07 Vessel Master 07 Regulating Authorities 07 … the vid starts after the initial failure, the barge in the foreground is the test load I believe.
CONTENT 1.Why conduct load test on foundation pile 2.Kentledge load test 3.Comply with guide lines on good practices for pile load test using Kentledge method in Singapore (Issue by GeoSS on 01-09-2011) 4.Different method of load testing …